Newport Road Repair Work Set for June 26
Road crews will perform repair work on Newport Road in the westbound direction from Winterhawk Road to a point 300 feet west of Evans Road o...
http://www.menifee247.com/2012/06/newport-road-repair-work-set-for-june.html
Road crews will perform repair work on Newport Road in the westbound direction from Winterhawk Road to a point 300 feet west of Evans Road on Tuesday, June 26 from 9 a.m. to 3 p.m. All businesses will be open during construction and motorists will have full access to them on Newport Road.
Traffic control will be provided for motorists through the construction zone. City of Menifee officials are telling motorists to expect minor delays during this construction period and suggest they use alternate routes. Every effort will be made to minimize the road construction duration.
Traffic control will be provided for motorists through the construction zone. City of Menifee officials are telling motorists to expect minor delays during this construction period and suggest they use alternate routes. Every effort will be made to minimize the road construction duration.
this is great! Newport rd is also in need of repair in between Antelope rd and Menifee rd. this is one of the oldest parts of Newport rd and has major pot holes in both directions. I have lived in Menifee for 16 years and i currently deliver Pizza and after driving on pretty much evey single road in menifee, this section of road is the worst of all.
ReplyDeleteThe signs say July 26th.
ReplyDelete